What we test in-house and what we send to an independent lab
Most corporate runs do not need full lab testing — the mill certificate covers the fabric, and the printing or embroidery is a separate process with its own controls. Where we commission additional testing is in four specific situations.
First, when a client needs a pilling or abrasion rating beyond what the mill reports. For uniforms that go through industrial laundering, or for items that will be carried daily for a year (laptop backpacks, weekend bags, travel organisers), we send pre-production samples to an independent lab in Athens or Milan for Martindale abrasion and pilling tests. The report gives a number (cycles to failure) that procurement can put in a tender.
Second, when a fabric is being printed with discharge or water-based pigment, we run a wash-fastness test on a strike-off to confirm that the print does not bleed or fade past the agreed threshold. The standard is ISO 105-C06 (one cycle, 40°C), and we ask the lab to grade against a grey scale. Anything below grade 3 is rejected before serial production starts. For Gulf hospitality uniforms that go through commercial laundering at 60°C to 80°C, we run the test at the higher temperature.
Third, for food-contact items — coffee mugs, thermal bottles, bottle carriers used by hospitality clients for in-room amenities or by airlines for premium cabins — we request a food-safety migration test from an EU-accredited lab. The relevant regulation is EU 1935/2004 for food contact materials, plus LFGB for the German market when the client exports there. The lead time on a migration test is usually two to three weeks, so we run it in parallel with the strike-off approval.
Fourth, for outdoor uniforms and high-UV-exposure items — roadwork vests, site uniforms, outdoor-event apparel, golf polos, branded caps — we commission UV colour-fastness testing to ISO 105-B02. A fabric that loses more than one grade on the blue scale after the equivalent of one Gulf summer is rejected for outdoor programmes. The test runs in parallel with the strike-off approval and the cost is built into the unit price.